Case Study

The Hollow,
Bath

Client: 
Freemantle Developments
Project: 
The Hollow
Location: 
Bath

Redcatch Construction was appointed to take over and complete the groundworks at The Hollow in Bath after the previous contractor’s departure. The works included installing a new attenuation crate system, completing a Wessex Water connection, constructing a pedestrian crossover, and surfacing both the private car park and sections of the adopted highway.

Delivered on time and to specification, the project ensured seamless continuity on-site and high-quality external works, fully compliant with local authority and utility standards.